Installation
NHTI is the contractor of choice
for suppliers and customers alike when quality, price and
schedule count. NHTI holds VAR status
and/or certified/approved installer status for most equipment
manufacturers in the industry. NHTI
design/construct services work closely with our highly skilled
and experienced group of installers, technicians and logistics
support personnel who conduct our installation operations.
This group currently operates nationwide performing installation
of telecom equipment for switching centers, microwave networks,
cellular/PCS systems, satellite earth stations, optical repeaters,
collocation facilities, LAN/WAN & wireless networks and many
other applications.
NHTI personnel routinely work in
critical communications facilities, performing installation,
turn-up and testing of essential telecom equipment upgrades
and new installations. Work is conducted in accordance with
(IAW) customer protocol and procedures that NHTI
adopts and utilizes for each installation. (Alternatively,
NHTI maintains a default protocol
standard for use where none exist.) NHTI
prepares and submits Method of Procedure (MOP) documentation
prior to project start-up. Chain of command and contact data
is provided for all appropriate NHTI
and customer personnel. Coordination with equipment manufacturers
and the customer is maintained with the expert assistance
of NHTI project management staff.
We offer a host of support services for both network equipment
installation and support infrastructure, including critical
power system design and installation; DC battery plant installation;
tenant improvement design/build services; code compliance
investigations; operation/maintenance of operating networks;
FCC licensing application and many other related functions.
We do all of this with our own staff of 100+ employees, meaning
that you achieve consistency, quality and reliability. Specific
work includes the following:
- Site preparation and underground utility installation
- Tower erection
- Complete electrical system installation including
main switchgear, redundant generator back-up systems, battery
back-up and UPS systems, and basic electrical installation
- Complete telecommunication infrastructure, including two-bar
and ladder to seismic zone 4 requirements, and rack installation
and isolation
- Central office facility grounding and lightning
protection
- Fiber management and duct bank installation
- Complete HVAC system installation
- Modular building integration
and installation
- Existing facility remodel
- Installation
of fiber optic cable, including pulling inter-duct through
existing manholes, installing new manholes, and constructing
duct banks
|